Tuesday, January 20, 2009
Robarts Renovation Update and 2009 Planning
The front page article in the lastest issue of the /University of Toronto Libraries Newsletter /described the renovation and construction work that is already underway as part of the overall Robarts renewal plan. If you haven't seen this article, it can be found at: http://content.library.utoronto.ca/general-information/news/utl-news/fall2008.pdf
By way of update regarding the two test projects, the north apex on the 9th floor is now scheduled for completion in early February. The construction boarding has come down and the area has been secured with fencing to allow for carpeting and finishing work.
Construction on the 5th floor will begin in February and is expected to continue into the early summer. Although the government publications and maps collections on the 5th floor will be accessible during the construction period, all staff currently working on the fifth floor will be relocated. Sherry Smugler and Vicky Escandor will move to the 6th floor in mid-January. The government publications processing function will have a permanent home on the 6th floor. The GIS Maps and Data staff, which includes Marcel Fortin, Laine Ruus, Susan Jewel, Gerald Romme and Bernie Disonglo, will move to space on the 1st floor in February. They will remain there for the duration of the construction and then move back to the 5th floor. Public service assistance for Data Maps and GIS will be delivered from the 1st floor location and will involve some travelling back and forth between the 1st and 5th floor. Signage and webpages will be updated to note this when the move takes place.
In preparation for construction, the 5th floor government publications collection has been reduced in size and redistributed. The map cabinets will remain on the 5th floor but will be shifted.
The planning and initial design process for the rest of the Robarts renewal and renovation will take place during the first six months of 2009. The process will include input and consultation with representatives of the staff groups residing in areas designated for renewal. General meetings will also be scheduled to update all interested staff on the overall planning process. The initial planning process will result in a costing exercise which will determine the overall extent of construction and scheduling timelines for specific areas. If all goes as planned, construction will begin in the late spring and continue on an area-by-area basis over a three year period. The continuous operation of the library throughout the construction is a given and will inform all scheduling considerations.
Further updates will be issued in the new year. The new main library webpage will also feature a link to renovation news.
Joan Leishman 16/12/2008
By way of update regarding the two test projects, the north apex on the 9th floor is now scheduled for completion in early February. The construction boarding has come down and the area has been secured with fencing to allow for carpeting and finishing work.
Construction on the 5th floor will begin in February and is expected to continue into the early summer. Although the government publications and maps collections on the 5th floor will be accessible during the construction period, all staff currently working on the fifth floor will be relocated. Sherry Smugler and Vicky Escandor will move to the 6th floor in mid-January. The government publications processing function will have a permanent home on the 6th floor. The GIS Maps and Data staff, which includes Marcel Fortin, Laine Ruus, Susan Jewel, Gerald Romme and Bernie Disonglo, will move to space on the 1st floor in February. They will remain there for the duration of the construction and then move back to the 5th floor. Public service assistance for Data Maps and GIS will be delivered from the 1st floor location and will involve some travelling back and forth between the 1st and 5th floor. Signage and webpages will be updated to note this when the move takes place.
In preparation for construction, the 5th floor government publications collection has been reduced in size and redistributed. The map cabinets will remain on the 5th floor but will be shifted.
The planning and initial design process for the rest of the Robarts renewal and renovation will take place during the first six months of 2009. The process will include input and consultation with representatives of the staff groups residing in areas designated for renewal. General meetings will also be scheduled to update all interested staff on the overall planning process. The initial planning process will result in a costing exercise which will determine the overall extent of construction and scheduling timelines for specific areas. If all goes as planned, construction will begin in the late spring and continue on an area-by-area basis over a three year period. The continuous operation of the library throughout the construction is a given and will inform all scheduling considerations.
Further updates will be issued in the new year. The new main library webpage will also feature a link to renovation news.
Joan Leishman 16/12/2008
Labels:
construction,
gis library,
robarts
Ovid MEDLINE Global Reload
Hello all,
Just a reminder that due to the reload we occasionally have questions early in the new year from those who have set up alerts in Ovid databases. They often wonder what has happened to their alerts. The reload sometimes delays new content from showing up in the alerts or the alerts themselves into early February. Please see below.
Sandra
-------- Original Message --------
Subject: 2009 Ovid MEDLINE® Global Reload
Date: Thu, 11 Dec 2008 14:48:14 -0800
*2009 Ovid MEDLINE® Global Reload*
*Dear Ovid Customer:*
We are working on the dataset for the 2009 Global Reload and look forward to completing the 2009 MEDLINE regeneration as quickly as possible. At this point, we expect that the reload will be live on OvidSP in mid-late January 2009*. *
As a reminder:
* The last MEDLINE Daily update went out on November 19, 2008.
* The last MEDLINE Weekly update went out on November 24, 2008.
No substantive field changes are currently planned for this reload. A complete description of the 2009 MeSH thesaurus changes are available by linking to:
http://www.nlm.nih.gov/mesh/whatsnew.html
If you should have any questions during this time, please contact us at
wkhealth-support@wolterskluwer.com
Sincerely, Ovid Technologies
Just a reminder that due to the reload we occasionally have questions early in the new year from those who have set up alerts in Ovid databases. They often wonder what has happened to their alerts. The reload sometimes delays new content from showing up in the alerts or the alerts themselves into early February. Please see below.
Sandra
-------- Original Message --------
Subject: 2009 Ovid MEDLINE® Global Reload
Date: Thu, 11 Dec 2008 14:48:14 -0800
*2009 Ovid MEDLINE® Global Reload*
*Dear Ovid Customer:*
We are working on the dataset for the 2009 Global Reload and look forward to completing the 2009 MEDLINE regeneration as quickly as possible. At this point, we expect that the reload will be live on OvidSP in mid-late January 2009*. *
As a reminder:
* The last MEDLINE Daily update went out on November 19, 2008.
* The last MEDLINE Weekly update went out on November 24, 2008.
No substantive field changes are currently planned for this reload. A complete description of the 2009 MeSH thesaurus changes are available by linking to:
http://www.nlm.nih.gov/mesh/whatsnew.html
If you should have any questions during this time, please contact us at
wkhealth-support@wolterskluwer.com
Sincerely, Ovid Technologies
Subscribe to:
Posts (Atom)